Vertical closed loops are typically installed where space is limited. A pair of pipes with a special u-bend are bored into the earth several hundred feet below the surface. Typically, 150-250 feet per ton. The hole is then filled with a grout for good heat exchange.
The diagram below illustrates the vertical closed loop shown on a small lot in the photo to the left.